On the level at Loughor
Posted on: August 26, 2010 by normanmaitland posted in News
The bad weather has slightly got in the way of a promising start in the restoration of a pitch at Loughor AFC which involves among other things sorting out a dramatic difference of 18 feet between one goal mouth and another.

A spot of bulldozing and laser levelling has done the trick and sand has been spread ready for installation of the drainage when we remobilize. After that of course there will still be much to do to create the playing surface itself.






